Underground Tank Optimisation

Client: APD Ltd.

Challenge: Design of the next generation of StormLite underground detention tanks

Process: Together with APD staff validate a number of new design variants for various depths and surface loading conditions

Result: A sump design with reduced shot wall thickness, increased maximum installation depth, and a wider application range

Image