Underground Tank Optimisation

    Client: APD Ltd.

    Challenge: Design of the next generation of StormLite underground detention tanks

    Process: Together with APD staff validate a number of new design variants for various depths and surface loading conditions

    Result: A sump design with reduced shot wall thickness, increased maximum installation depth, and a wider application range

    Slide3

     

    © 2017 Arend Engineering and Mangement Limited. All Rights Reserved.

    Please publish modules in offcanvas position.